Wildfire Conditions
Updates are also available on our Facebook page.
May 26
7:15pm – It is anticipated that town facilities, and many local business, will be open on or before Monday, May 29, 2023.
The Town is Intact.
Welcome Home.
Stay Safe.
7:30am – This was prepared for the digital billboard and intended to run throughout the week. Better late than never and maybe even more poignant than ever.
May 25
6:00am – Welcome home Fox Creek, we are so happy to see you!
Welcome Home Reception , Kaybob Drive May 24, 2023.
May 24
10:00pm – We have scheduled extra garbage pick ups this week. ALL garbage will be picked up both tomorrow (Thursday) and Saturday..
4:00pm – The Welcome Home information package can be downloaded here.
.
.
.
.
.
.
12:30pm – High River Deputy Fire Chief Steve Debienne
Fox Creek Fire Thank You from High River
.
10:00am – As of 12:00 pm, May 24, 2023, the evacuation for the Town of Fox Creek will be lifted and community re-entry can now occur safely.
May 23
9:00pm – Consecutive days of heavy rain are bringing relief and optimism to Alberta, where the precipitation has helped extinguish the province’s dozens of raging wildfires.
12:00pm – Precipitation
9:45 am- Fire operations will proceed as they did yesterday with crews continuing to work towards achieving full containment on the fire guard on both fires.

May 22

5:45pm- Approximately 12 select workers for critical infrastructure such as hospital, power and gas utilities, the grocery store and required municipal staff have been allowed entry into the evacuation area today under a shelter in place order to re-establish services in preparation for when it is safe to lift the evacuation order.
Plans are underway to re-open the community to the general public as soon as it is safe to do so. Triggers have been put into place that include the containment of the fire along the perimeter and received precipitation. At this time, we are still unsure of when those triggers will be met.
It is important that returning residents have access to these services prior to re-entry so the process is as smooth and hassle-free as possible, especially for those with additional needs.
10:40am – The Town is intact.
May 21
Active wildfire crews and utility repair crews will be working along the highway, please slow to 60km/h when passing crews.
May 20 The beginning of week three
6:10pm –The Town is Intact.
Highway 43 will remain closed, due to poor visibility, until 7 am.
As for billboard messages several, though not all are running. And tonight Gabriel gets the last word.
.
(click image to enlarge)